Reform neglected pond – Aug 5th 2021

By | Projects | No Comments

BSA Environmental were asked to reform an old pond that had been neglected for many years and was not holding water.

The pond was drained, 2 foot of sludge at the bottom of the pond was removed and 80 tonnes of clay was brought to site and puddled into the sides and base of the pond.

The result was the pond could retain the water as seen in the finished photograph.

All grounds were cleared and a new sewage treatment plant was installed along with a new ditch on the border of the property to intercept water coming down the hill.